As Construction.RU was told today by the press office of the Moscow Construction Department, the initial (maximum) cost of the state contract is 385.5 m roubles. About 18 km of roads need to be designed, constructed and reconstructed in Mnevniki flood plain.
The tender winner will have to design two foot bridges across the Moscow-river, and the Moscow-river embankment. All the work is to be completed within 8 months from the date of the state contract conclusion. The results of the tender will be known on November 9th.