The products of the factory with the capacity of 500,000 cubic m are used in the production of wooden frame-panel buildings. VEB allotted 20.7 bln roubles ($345m) for the project.
OSB production line is the largest in Russia. 50% of the total volume of production will be sold on the interior market, 50% will be exported to Europe, Asia, Australia, the UAE and the USA.
Pre-fabricated wooden frame-panel houses will also be produced at the factory, 125 houses a year.
The expected budgetary efficiency of the project is over 13 bln roubles (over $216m) for 10 years.