“The ratio of the use of Russian materials, equipment, technologies will be 70 to 30 in favor of Russian companies. The total funding for the station is $1.4 billion, of which $1.2 billion will be allocated from the publicly funded loan. Of course, this envisages interests, these are income generating investments of the Russian budget”, - Novak said, commenting on Sirik TPP.
On 20 February, Russia and Iran set to the construction of Sirik thermal power plant with a capacity of 1.4 GW in the city of Bandar Abbas located in southern Iran.