“Currently, a land plot for a construction site has been prepared, as well as pre-project documentation has been developed. Following the consideration of final proposals of the participants of a tender “Construction of TPP in Pancevo (Serbia),” a Tender Commission decided to determine the winner and sign a EPC contract with Metka S. A. (Greece)”, — the message reads.
The facility is expected to be put in operation at the end of the year 2019.