According to the Moscow authorities, the three-story building was erected on the same site where the old building of the Swiss diplomatic mission was earlier located.
The facility with a total area of 6,200 square meters is situated at the address: Pereulok Ogorodnaya Sloboda, 2/5. The Moscow authorities say that the developer that conducted building activities on the site has received a conclusion on compliance with technical requirements and project documentation.
As a result of inspections, all violations have been eliminated. So, the facility is scheduled to be put into operation in the third quarter of 2018.