DataLife Engine / RUB 33 bln tender for construction of Eastern exit road from Ufa

RUB 33 bln tender for construction of Eastern exit road from Ufa

The project is estimated at 32,7 bln roubles.

A winner will have to finance both the construction and reconstruction, as well as the road maintenance at the exit from Ufa to M-5 “Ural” highway, the regional press office told Construction.RU on Tuesday.

The project includes erection of a highway tunnel aligned with a bridge passage across the Ufa River, the road section from the bridge to M-5 “Ural” highway.

Period of design and construction of the object will not exceed 4 years. The total length of the object is approximately 16 km.

14-06-2016, 14:26
Вернуться назад