DataLife Engine / Over 100m roubles to be invested in bridge construction in Chechnya

Over 100m roubles to be invested in bridge construction in Chechnya

The Head of the Chechen Republic, Ramzan Kadyrov, has taken the control over this project.

According to the technical design specification, the contractor will have to construct an automobile bridge with the length of 65 meters across Aksai River. The works must be completed by July 2017.

Sayasan – Benoi – Vedeno motorway located in the Nozhai-Yurotovski region of Chrchnya was severely damaged by landslides. Builders had to reconstruct covering, erect special retaining walls.

28-10-2016, 15:40
Вернуться назад