The Directorate-General for State Environmental Review of Russia has issued a positive conclusion to a project for the second phase of the construction of a gas pipeline from Vladimirovka gas distribution station to Sakskiy TS heating electrical station in the Crimea.
According to the agency, a positive conclusion was issued after the experts reviewed the project documentation and the results of engineering surveys.
The planned pipeline will run from the existing gas pipeline Du500 Glebovka-Simferopol. Within the framework of the second stage of the construction, a gas pipeline with a length of more than 7,368 meters will be laid from the Glebovka-Simferopol pipeline and the gas distribution station.